Landfill Solidification Pit and Offload Area

PMI was awarded a design/build project for a local Class 1 landfill.  The project consisted of removing the old solification pit and installing two new pits.  With an additional pit, the owner can now solidify and offload customers at the same time.  The offload area surrounding the pits was expanded to allow multiple customers access at the same time.