800+ Acre Farm

PMI performed a Phase I Environmental Site Assessment (ESA) on an 800+ acre farm in eastern Arkansas.  Based on the findings of the Phase I ESA, PMI conducted a Phase II Limited Subsurface Investigation to further assess if the shallow soils on a portion of the property had been impacted by metals. Based on laboratory analysis, it was determined that the property had elevated metals contamination. PMI formulated an excavation and disposal plan to remove the impacted soils from the property and to dispose of them at a local landfill.  PMI conducted confirmation sampling and placed clean fill material into the excavated area.